Description
Product Features
- TOUGHBOOK certified dock supports the Panasonic TOUGHBOOK G2 2-in-1 in public safety, military, utilities, and other demanding environments
- Panasonic certified electronics with standard port replication to connect multiple mission-critical peripherals
- Increased connector protection via retractable cover that protects pins when device is absent
- Lightweight & compact design
- Bundle includes DS-PAN-1014 docking station and LPS-102 power supply
- Integrated cable management system
- Rounded edges for comfort & safety
- Lock and key supplied for peace of mind theft deterrence
- Supports legacy TOUGHBOOK 20 2-in-1 devices
- 3 Year Limited Standard Warranty, Enhanced Protection Plan Option Available
- Made in the USA
- Install Video: Panasonic TOUBOOK 20 & 33
Product Specs
- Compatible computers: Panasonic TOUGHBOOK G2 2-in-1 & TOUGHBOOK 20 2-in-1 devices
- Dimensions: 2.5″ (6.35 cm) x 11.06″ (28.09 cm) x 9.6″ (24.38 cm)
- Certifications: Panasonic Toughbook Certified, UL Safety Certified, Vibration Testing: MIL-STD 810G 514.5, Crash Test: SAE J1455 30mph crash testing, Cycle Test: latch handle & docking connectors mechanism 30,000 cycles, Environmental Testing: Hot/Cold operational & storage
- Connectivity: USB: fully-powered USB 3.0 (2), Ethernet: RJ45 Ethernet (1), Serial: DB9 (9-Pin) connection (1), Dock Input Power: 16.0 V DC
- Product weight: 4.30 lbs. (1.95 kg)
User Manuals and Installation Instructions
View DS-PAN-1015 Manual
Availability, Lead Times and Shipping
Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.
- Basic mounting hardware such as plates or poles: 1-2 weeks to ship
- Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
- Powered docking stations with port replication: 4-8+ weeks to ship.
Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.