Sale!

Havis Power Supply with Lighter Plug for use with DS-GTC-220, DS-GTC-610, DS-GTC-800, DS-GTC-900, DS-GTC-1000, DS-GTC-1100, DS-GTC-1200, DS-GTC-1300 & DS-GTC-1400 Series Docking Stations (LPS-140)

Original price was: $21200.Current price is: $18000.

SKU: LPS-140

Description

Product Features

  • Compatible Havis docking stations: DS-GTC-220 Series, DS-GTC-610 Series, DS-GTC-800 Series, DS-GTC-900 Series, DS-GTC-1000 Series, and DS-GTC-1300 Series
  • Compatible computers: Getac S410 notebook, Getac A140 rugged tablet, Getac K120 convertible laptop & tablet, and Getac ZX10 tablet
  • Power supply includes: 120 watt Getac power supply, 36″ output cable with 90 degree connector, 82″ input cable with cigarette lighter adapter
  • LPS-208 accessory bracket for panel mounting also included
  • Optional accessory LPS-211 required for mounting to the left or right hand side of the docking station sold separately
  • Some applications will require power supply with LPS-211 to be mounted to the side of tilt swivel for improved clearance

Product Specs

  • Watts: 120
  • Voltage: 11-32 VDC input, 19 VDC output
  • Input cable: 72″ cigarette lighter adaptor
  • Output cable: 36″ 90-deg; connector

User Manuals and Installation Instructions
View LPS-140 Manual


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeksor longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

Description

Description

Product Features

  • Compatible Havis docking stations: DS-GTC-220 Series, DS-GTC-610 Series, DS-GTC-800 Series, DS-GTC-900 Series, DS-GTC-1000 Series, and DS-GTC-1300 Series
  • Compatible computers: Getac S410 notebook, Getac A140 rugged tablet, Getac K120 convertible laptop & tablet, and Getac ZX10 tablet
  • Power supply includes: 120 watt Getac power supply, 36″ output cable with 90 degree connector, 82″ input cable with cigarette lighter adapter
  • LPS-208 accessory bracket for panel mounting also included
  • Optional accessory LPS-211 required for mounting to the left or right hand side of the docking station sold separately
  • Some applications will require power supply with LPS-211 to be mounted to the side of tilt swivel for improved clearance

Product Specs

  • Watts: 120
  • Voltage: 11-32 VDC input, 19 VDC output
  • Input cable: 72″ cigarette lighter adaptor
  • Output cable: 36″ 90-deg; connector

User Manuals and Installation Instructions
View LPS-140 Manual


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeksor longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

SHIPPING AND LEAD-TIMES

Important: Choosing an expedited shipping option at checkout only affects the delivery speed after your item ships. It does not guarantee same-day or next-day shipping.

General Lead Time Guidance for items not in stock

  • Toughbooks: Several in stock options, but often have lead times of 2–12 weeks, depending on configuration
  • Getac Computers: May take 4-6 weeks to ship
  • Vehicle Equipment
    • Basic mounting hardware (e.g., plates, poles): Usually ships in 1–2 weeks
    • Vehicle-specific or complex mounting kits: Usually ships in 2–4 weeks
    • Docking stations with port replication: May take 4–8+ weeks to ship

Availability changes daily due to high demand and supply chain constraints.
Please call us at 888-337-3007 or use our chat feature to confirm product availability before placing urgent orders.

We’re here to help you get what you need—as quickly as possible.

Crop Image