Description
Product Features
- Package – cradle (no dock) with triple pass-through rf antenna connections, LPS-140 (120W Getac vehicle power supply with LPS-208), and LPS-211 (multipurpose bracket) for Getac K120 tablet
- Includes LPS-140 power supply with LPS-208 panel mount bracket for convenient mounting of the power supply
- Includes LPS-211 accessory bracket for mounting the power supply directly to the docking station
- Cradle-only version with no Electronics gives you a safe and secure mounting option for your tablet.
- Low profile design maximizes available space inside of vehicle
- Rounded corners and edges are ideal for your safety in accidents and airbag deployment, in addition to daily use and operation of docking station
- Designed to fit all Havis and VESA 75 hole pattern mounting equipment, as well as most competitors
- Lock and key supplied for peace of mind theft deterrence
Product Specs
- Compatible computer: Getac K120 tablet
- Dimensions: 11.7″ l, 11.95″ w, 3.9″ h (297.2mm x 303.5mm x 99.1mm)
- Certifications: Vibration Testing: MIL-STD 810G 514.5, crash test: SAE J1455 30mph Crash Testing, cycle test: latch handle & docking connectors mechanism 30,000 cycles, environmental testing: hot/cold operational & storage and thermal shock; bump testing
- Docking station net weight: 3.39 lbs (1.54 kg)
- Docking station product weight: 4.91 lbs (2.23 kg)
- Product weight: 7.50 lbs (3.40 kg)
User Manuals and Installation Instructions
View PKG-DS-GTC-906-3 Manual
Availability, Lead Times and Shipping
Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.
- Basic mounting hardware such as plates or poles: 1-2 weeks to ship
- Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
- Powered docking stations with port replication: 4-8+ weeks to ship.
Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.