Description
Product Features
- Supports Getac’s V120 laptops in the Public Sector, Utility Services, Defense, Material Handling, and other demanding environments
- Advanced port replication includes video capability as well as standard options to support mission-critical peripherals
- Includes DS-DA-424 Screen Support, designed to support the laptop screen and reduce vibration
- Spring-loaded, floating docking connector head ensures connectivity even through heavy vibration
- Getac Power Supply Included (LPS-140-BW)
- Compact & lightweight while being ultra rugged
- Lock and key supplied for peace of mind theft deterrence
- Integrated cable management system
- Designed to fit all Havis and VESA 75-hole pattern mounting equipment, as well as most competitors
- Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
- Rounded edges and corners for comfort and safety
- Made in USA
- Compatible computer: Getac V120
- Dimensions: 11.8″ (300mm) H x 11.1” (282 mm) W x 3.1” (77 mm) D
- Certifications:
Vibration Testing: MIL-STD 810H 514.8
Crash Testing: SAE J1455 30mph
Bump Testing: IEC-68-2006-27
Cycle Testing: Dock/undock 30K cycles
Environmental Testing: Hot/Cold operational -31° C to 63° C (-23.8° F to 145° F); Hot/Cold storage -40° C to 85° C (-40° F to 185° F)
Thermal Shock: MIL-STD 810H, Method 503.7
FCC, CE, CAN ICES (B), RoHS
EMC Testing: EN 55032, EN 50498
ESD: IEC 10605 - Connectivity includes:
Advanced:
(1) USB 2.0 (Front Facing)
(2) USB 3.2
(1) USB-C 2.0 (Front Facing)
(1) USB-C 3.2
(1) RJ45 Ethernet
(1) Powered Serial DB9 (9-Pin)
(1) HDMI - Product weight: 6.9 lbs.
- Gross Weight: 0 lbs
Availability, Lead Times and Shipping
Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.
- Basic mounting hardware such as plates or poles: 1-2 weeks to ship
- Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
- Powered docking stations with port replication: 4-8+ weeks to ship.
Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.