Description
Product Features
- Supports Panasonic’s TOUGHBOOK S1 tablet in warehouse, field service, transportation, delivery, retail, and other demanding enterprise environments.
- Fully rugged docking station for TOUGHBOOK S1
- Low profile, lightweight & versatile docking station design
- TOUGHBOOK Certified port replication with integrated cable management
- Includes LPS-160 power supply with customized cord length and connector tip
- Full access to computer features & ports
- Rounded corners and edges provide safety in accidents and during airbag deployment, in addition to daily use and operation of docking station
- Lock and key supplied for peace of mind theft deterrence
- 3-Year limited standard warranty, enhanced protection plan option available
- Made in the USA
- Also compabitle with TOUGHBOOK L1 tablets
Product Specs
- Compatible computer: Panasonic TOUGHBOOK S1 and L1 tablets
- Dimensions: 7.08″ (17.98 cm) x 7.89″ (20.04 cm) x 2.45″ (6.22 cm)
- Certifications: Panasonic TOUGHBOOK Certified, UL safety certified, Vibration Testing: MIL-STD 810G 514.5, crash test: SAE J1455 30mph Crash Testing, cycle test: latch handle & docking connectors mechanism 30,000 cycles, environmental testing: hot/cold s
- Connectivity: USB: fully-powered USB 2.0 (1), input power: 5 v DC
- Product weight: 0.98 lbs. (0.45 kg)
User Manuals and Installation Instructions
View DS-PAN-1302 Manual
Availability, Lead Times and Shipping
Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.
- Basic mounting hardware such as plates or poles: 1-2 weeks to ship
- Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
- Powered docking stations with port replication: 4-8+ weeks to ship.
Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.