Sale!

Havis Gooseneck LED Map Light (C-MAP-T-LED)

Original price was: $16200.Current price is: $13000.

SKU: C-MAP-T-LED

Description

Product Features

  • 12″ top mount LED map light with high-durability flexible gooseneck
  • High-quality, highly efficient, cool-running LED map light
  • Two high-output lumileds® luxeon 3W LEDs – one for red light and one for white light
  • Electronically-regulated light output for maximum efficiency and expected life at least 30,000 hours
  • On/off/on switch (on red / off / on white)
  • Uniform wide-area light output with near-zero glare and no wasted light
  • Clear lens to protect the LEDs
  • More than 3X light output compared to halogen models with a 40% reduction in current draw
  • Extra-large 1-1/8″ diameter by 2-1/2″ long finned aluminum heatsink to provide effective cooling of the LEDs
  • Mounts with two #6-32 tapped holes spaced 1-23/32″ apart, with a 1/2″ wire exit located 5/8″ from and in-line with the mounting holes.
  • For a 12 volt application (input voltage range = 10 VDC to 15 VDC)

Product Specs

User Manuals and Installation Instructions
View C-MAP-T-LED Manual


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeksor longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

Description

Description

Product Features

  • 12″ top mount LED map light with high-durability flexible gooseneck
  • High-quality, highly efficient, cool-running LED map light
  • Two high-output lumileds® luxeon 3W LEDs – one for red light and one for white light
  • Electronically-regulated light output for maximum efficiency and expected life at least 30,000 hours
  • On/off/on switch (on red / off / on white)
  • Uniform wide-area light output with near-zero glare and no wasted light
  • Clear lens to protect the LEDs
  • More than 3X light output compared to halogen models with a 40% reduction in current draw
  • Extra-large 1-1/8″ diameter by 2-1/2″ long finned aluminum heatsink to provide effective cooling of the LEDs
  • Mounts with two #6-32 tapped holes spaced 1-23/32″ apart, with a 1/2″ wire exit located 5/8″ from and in-line with the mounting holes.
  • For a 12 volt application (input voltage range = 10 VDC to 15 VDC)

Product Specs

User Manuals and Installation Instructions
View C-MAP-T-LED Manual


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeksor longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

SHIPPING AND LEAD-TIMES

Important: Choosing an expedited shipping option at checkout only affects the delivery speed after your item ships. It does not guarantee same-day or next-day shipping.

General Lead Time Guidance for items not in stock

  • Toughbooks: Several in stock options, but often have lead times of 2–12 weeks, depending on configuration
  • Getac Computers: May take 4-6 weeks to ship
  • Vehicle Equipment
    • Basic mounting hardware (e.g., plates, poles): Usually ships in 1–2 weeks
    • Vehicle-specific or complex mounting kits: Usually ships in 2–4 weeks
    • Docking stations with port replication: May take 4–8+ weeks to ship

Availability changes daily due to high demand and supply chain constraints.
Please call us at 888-337-3007 or use our chat feature to confirm product availability before placing urgent orders.

We’re here to help you get what you need—as quickly as possible.