Description
Product Features
- Supports Getac’s S510 Laptop in Public Sector, Utility Services, and other demanding environments
- Advanced port replication includes video capability as well as standard options to support mission-critical peripherals
- Equipped with triple pass-through antenna connections
- Includes Getac 120W Power supply (LPS-140-BW)
- Compatible with screen support DS-DA-418 (Sold Separately)
- Reinforced mounting bracket
- Spring-loaded, floating docking connector head ensures connectivity even through heavy vibration
- One-handed docking & undocking
- Durable, compact & lightweight
- Integrated cable management system
- Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
- Rounded edges and corners for comfort and safety
- Keyed lock for added security
- Made in USA
Product Specs
- Compatible computer(s): Getac S510 Laptop
- Certifications: Vibration Testing: MIL-STD 810H 514.8 Crash Testing: SAE J1455 30mph Cycle Testing: Latch handle and docking connectors 30K cycles Environmental Testing: Hot/Cold operational -29°C to 63°C (-20°F to 145°F); Hot/Cold storage -40°C to 85°C (-40°F to 185°F)
- Port Replication: Advanced: (1) HDMI (2) USB 2.0 (Front Facing) (2) USB 3.0 (1) USB-C (1) RJ45 Ethernet (1) Powered Serial Port (5V) Antenna type: (3) SMA
- Approved Power Supplies: LPS-140-BW
- Dimensions: 11.41” (28.98 cm) H x 15.04” (38.20 cm) W x 2.75” (6.99 cm) D
- Product Weight: 5.7 lbs. (2.59 kg)
Availability, Lead Times and Shipping
Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.
- Basic mounting hardware such as plates or poles: 1-2 weeks to ship
- Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
- Powered docking stations with port replication: 4-8+ weeks to ship.
Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.