Gamber-Johnson 7160-0552: 2015+ Ford Transit Console Leg Kit

$9000

SKU: 7160-0552

Description

Placement

  • Attaches to the mounting points on the side of the transmission hump

Seat Configuration

  • Bucket

Drilling Required

  • No

Features

  • Heavy gauge steel construction for long-term durability
  • Black powdercoat finish for maximum corrosion resistance
  • Legs attach to both short and long MCS Top Plates (Item No. 7160-0085 or 7160-0086)
  • Works with electric seat using full range of movement

Warranty

  • Limited Lifetime Warranty


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship.  Lead times can often be 3-6+ weeks or longer depending on the exact items purchased.  The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles:  1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions:  2-4 weeks to ship
  • Powered docking stations with port replication:  4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs.  Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

 

Additional information

Weight 10 lbs
Brand

Gamber Johnson

Description

Description

Placement

  • Attaches to the mounting points on the side of the transmission hump

Seat Configuration

  • Bucket

Drilling Required

  • No

Features

  • Heavy gauge steel construction for long-term durability
  • Black powdercoat finish for maximum corrosion resistance
  • Legs attach to both short and long MCS Top Plates (Item No. 7160-0085 or 7160-0086)
  • Works with electric seat using full range of movement

Warranty

  • Limited Lifetime Warranty


Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship.  Lead times can often be 3-6+ weeks or longer depending on the exact items purchased.  The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles:  1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions:  2-4 weeks to ship
  • Powered docking stations with port replication:  4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs.  Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

 

Additional information

Weight 10 lbs
Brand

Gamber Johnson

SHIPPING AND LEAD-TIMES
In general, Panasonic Toughbooks, accessories and related mounting equipment are enterprise solutions that are typically custom built to order and thus carry a lead-time of anywhere from 2-3 weeks to 2-3 months. Please be advised that online orders where expedited shipping is chosen does NOT mean that specific product is in stock and will ship right away. It simply means we will ship via the selected method when the product is available to ship. We can only confirm availability over the phone or online chat. While we do our best to have a wide variety of Toughbook models and accessories in stock, this particular supply chain is challenging and we ask that customers please confirm availability with us on the phone when time is a priority. Additionally, expedited shipping will not apply to multiple items that might have multiple lead-times and ship dates. It is typically applying to the main item of an order. Again, please call us ASAP at 877-532-8088 to discuss urgent needs and expedited shipping.